PT SAPTA BORNEO UTAMA
Return to Project Documentation Data Room Index Institutional Data Room
SBU Logo
PT SAPTA BORNEO UTAMA
Institutional Virtual Data Room
SBU-PROJ-005 Confidential Final / Published

Detailed BOQ & Use of Funds

Executive Summary

This Detailed BOQ & Use of Funds presents the capital allocation schedule for PT Sapta Borneo Utama's USD 1,000,000,000 Integrated Sugar Mill, Ethanol Plant, Biomass Power Plant, Plantation Development and Carbon Credit Program.

The document provides a comprehensive breakdown of project expenditures, EPC costs, infrastructure development, plantation expansion, working capital, contingency reserves and project finance structure.

BOQ Overview

This document presents the detailed allocation of the USD 1,000,000,000 capital investment required for the development of PT Sapta Borneo Utama's Integrated Sugar Mill, Ethanol Plant, Biomass Power Plant, Plantation Expansion, Carbon Credit Program and Supporting Infrastructure.

USD 1.0 BillionTotal Project Cost
10,000 TCDSugar Mill Capacity
60 KLPDEthanol Plant
30 MWBiomass Power Plant
20,000 HaPlantation Program
24–30 MonthsConstruction Period

Funding Structure

  • Equity Contribution: USD 200,000,000 (20%)
  • Senior Debt Financing: USD 800,000,000 (80%)
  • Debt Tenor: 20 Years
  • Fixed Interest Rate: 3.00% p.a.
  • Minimum DSCR: 1.30x
  • DSRA Requirement: USD 35.27 Million
  • EPC Contract Value: USD 442.5 Million

10,000 TCDSugar Factory
60 KLPDEthanol Plant
30 MWBiomass Power Plant
500 HaCore Plantation
SP-01 to SP-05Industrial Zoning
24–30 MonthsImplementation Period

Funding Structure

Detailed Use of Funds Allocation

Component Amount (USD) Allocation
Sugar Mill EPC442,500,00044.25%
Ethanol Plant95,000,0009.50%
Biomass Power Plant80,000,0008.00%
Plantation Development85,000,0008.50%
Infrastructure & Utilities70,000,0007.00%
Storage & Logistics40,000,0004.00%
Land & Site Development90,000,0009.00%
Executive Facilities16,000,0001.60%
ESG & Carbon Credit Program18,000,0001.80%
Working Capital & Contingency63,500,0006.35%
Total Project Cost 1,000,000,000 100%

SP-01 — Main Process Area

FacilityPurpose
Cane ReceptionReceiving and weighing sugarcane.
Cane PreparationPreparation before milling.
Milling StationJuice extraction from sugarcane.
Juice TreatmentClarification and preparation for evaporation.
Evaporation & CrystallizationSugar concentration and crystallization.
Drying & PackingFinal sugar drying, packaging and dispatch preparation.
Ethanol FacilityProcessing molasses or feedstock into ethanol products.

SP-02 — Utilities & Biomass Power Area

UtilityPurpose
30 MW Biomass Power PlantRenewable power generation from bagasse and biomass residues.
Boiler HouseSteam generation for process and power.
Steam Turbine GeneratorPower production and cogeneration.
Water Treatment PlantRaw water and demineralized water treatment.
Wastewater Treatment PlantEnvironmental compliance and wastewater management.
Firewater SystemFire protection and emergency response.
Electrical SubstationPower distribution and grid interface.

SP-03 — Warehouse & Logistics Area

FacilityPurpose
Finished Sugar WarehouseStorage of final sugar products.
Ethanol Storage TanksStorage and dispatch of ethanol products.
Molasses Storage TanksMolasses storage for ethanol and industrial use.
Chemical WarehouseControlled storage of process chemicals.
Spare Parts WarehouseMaintenance and spare parts storage.
Truck Loading AreaInbound and outbound logistics control.
WeighbridgeVehicle and material weight measurement.

SP-04 — Supporting Facilities Area

FacilityPurpose
Administration OfficeManagement and corporate operations.
Security PostAccess control and site security.
Training CenterWorkforce training and safety briefings.
Clinic / First Aid StationOccupational health and emergency support.
WorkshopMaintenance and repair activities.
LaboratoryQuality control and testing.
Parking and Assembly AreaEmployee parking and emergency assembly.

SP-05 — Future Expansion & Green Buffer Area

Internal Circulation Plan

The site masterplan includes separate circulation systems for:

Design principles include separation of heavy vehicles and pedestrians, one-way traffic where feasible, safe entry and exit control, emergency vehicle access and adequate turning radius for industrial trucks.

Environmental Management Features

AreaFeature
WaterWastewater treatment, stormwater drainage and water management infrastructure.
Pollution ControlOil and chemical containment, dust control, noise mitigation and solid waste areas.
Green BufferLandscaped buffer zones, environmental protection areas and drainage retention.

Safety & Security Features

Masterplan Conclusion

The PT Sapta Borneo Utama Detailed BOQ & Use of Funds provides a structured industrial layout to support the long-term development of an integrated sugar, ethanol, biomass power, plantation and sustainability platform.

Document Information

Document OwnerPT Sapta Borneo Utama
ProjectUSD 1 Billion Integrated Sugar Factory Project
LocationMajalengka, West Java, Indonesia
ClassificationConfidential
StatusFinal / Published
Prepared ForLenders, ECAs, Institutional Investors and Strategic Partners
DateJune 2026

Revision History

VersionDateDocument No.StatusDescription
1.0June 2026SBU-PROJ-005Final / PublishedDetailed BOQ & Use of Funds issued for institutional lender data room publication.